My Projects

 Maligawatta Storm Water Rehabilitation Project.


That inclusive of   construction of drain system for  Blocks J-K-H.pipe laying with RCC hume pipes.(dia 18" and 12") 09 nos. RCC Manholes.Total cost is approximately 2.8Million Rupees.