My Projects
Maligawatta Storm Water Rehabilitation Project.
That inclusive of construction of drain system for Blocks J-K-H.pipe laying with RCC hume pipes.(dia 18" and 12") 09 nos. RCC Manholes.Total cost is approximately 2.8Million Rupees.
Home
Subscribe to:
Posts (Atom)